{"id":44970,"date":"2018-06-14T11:26:00","date_gmt":"2018-06-14T15:26:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/new-contract-for-agf-peru"},"modified":"2024-05-07T15:31:48","modified_gmt":"2024-05-07T19:31:48","slug":"new-contract-for-agf-peru","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/new-contract-for-agf-peru","title":{"rendered":"New contract for AGF Peru"},"content":{"rendered":"<div>\n<p>We are pleased to inform you that after intensive negotiations with the Lima Metro Consortium over the past two years, we signed a contract on May 28. Serge Gendron, president of AGF Group Inc., made a quick trip to Lima for the occasion.<\/p>\n<p>As part of this contract, AGF Peru will take part in the fabrication and installation of 100% of the rail segments (22,000 MT) and 25% of the metro stations (56,000 MT). The contract represents a total of $34 million US.<\/p>\n<p>We were also pleased to see that the production and productivity of our Peruvian shop, in the facilities of our local partner Gerdau-Sider Peru, continues to grow steadily.&nbsp;<\/p>\n<p>I would like to thank all the workers on our Peruvian team for their efforts and their commitment, which make this excellent work possible!<\/p>\n<p>In conclusion, thanks to the 26 engineering students from the University of Lima who visited us last week to learn about the industrial fabrication of rebar. During their visit, they showed great interest in the machines and how the workshop operates.&nbsp;<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_2160-4.jpg\" style=\"height:360px; width:480px\" title=\"\">&nbsp;<img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_6762-4.jpg\" style=\"height:360px; width:480px\" title=\"\"><\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2113.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<h2>Nuevo acuerdo para AGF Per&uacute;<\/h2>\n<p>Es un placer informarles que despu&eacute;s de intensas negociaciones con el consorcio de la L&iacute;nea&nbsp;2 del Metro de Lima durante los dos &uacute;ltimos a&ntilde;os, firmamos un acuerdo con ellos el 28 de mayo de 2018. El Sr.&nbsp;Gendron, Presidente de Grupo AGF Inc., hizo una visita rel&aacute;mpago a Lima para esta ocasi&oacute;n.<\/p>\n<p>En el contexto de este contrato, AGF Per&uacute; participar&aacute; en la fabricaci&oacute;n y en la instalaci&oacute;n del 100% de los segmentos de los carriles (22&nbsp;000&nbsp;t) y en el 25% de las estaciones del metro de Lima (56&nbsp;000&nbsp;t). El monto total del contrato representa 34 millones de d&oacute;lares estadounidenses.<\/p>\n<p>Por otra parte, nos alegra observar que la producci&oacute;n y la productividad de nuestro taller peruano, en las instalaciones de nuestro socio local Gerdau-Siderperu, contin&uacute;a su crecimiento continuo.<\/p>\n<p>Deseo agradecerles a todos los trabajadores de nuestro equipo en Per&uacute; por sus esfuerzos y su dedicaci&oacute;n, &iexcl;los cuales permiten realizar este excelente trabajo!<\/p>\n<p>Para finalizar, agradezco sinceramente a los veintis&eacute;is estudiantes de ingenier&iacute;a de la Universidad de Lima quienes nos visitaron la semana pasada para descubrir el procedimiento de fabricaci&oacute;n industrial del acero de refuerzo. Demostraron mucho inter&eacute;s por el funcionamiento del taller y de nuestras m&aacute;quinas durante su visita.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>We are pleased to inform you that after intensive negotiations with the Lima Metro Consortium [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":44961,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-44970","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/44970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=44970"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/44970\/revisions"}],"predecessor-version":[{"id":57533,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/44970\/revisions\/57533"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/44961"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=44970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=44970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=44970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}