{"id":45412,"date":"2018-11-17T11:47:00","date_gmt":"2018-11-17T16:47:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/jamal-nasser-bridge"},"modified":"2024-05-07T15:34:01","modified_gmt":"2024-05-07T19:34:01","slug":"jamal-nasser-bridge","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/jamal-nasser-bridge","title":{"rendered":"Jamal Nasser Bridge"},"content":{"rendered":"<div>\n<p>In 2012, Babich International was engaged by ROBT (Rizanni De Eccher, Obrasc&oacute;n Huarte Lain, Boodai Construction, Trevi Group Joint Venture) to carry out the function of steel fixing reinforcement for the structures at the emblematic 120,000 MT RA167 Jamal Abdul Nasser Bridge Project in the State of Kuwait.<\/p>\n<p>The total project is 7.2 km of elevated highway supported by over 200 piers. It has 0.7km of depressed road and approximately 14 km of service roads including 6 cross link roads, 9 roundabouts, 15 ramps, three interchanges plus a four-level interchange.<\/p>\n<p>Alex Schmalz, Project Director, Rizanni De Eccher recently said, &ldquo;This has been a demanding project with high quality construction and long- term durability requirements which whilst being complex to achieve, Babich&rsquo;s involvement enabled us to achieve our goals. Babich is an excellent steel fixing Contractor and they are a valuable member of our Projects resources throughout the Middle East.&rdquo;<\/p>\n<p>At peak production, Babich employed 270 personnel and installed 2800 MT of rebar each month. During the long summer months, personnel worked in extreme temperatures of over 50 degrees celsius and then by contrast experienced swift temperature drops to -5 degrees once winter approached. Personnel came from many countries including Canada, India, Philippines, Thailand, Nepal and France. On all fronts, the project was a success. Babich achieved budget, HPT targets, profit and throughout 5 years of over 1.7 million total man-hours, there were no serious LTI. Career development for many Foremen into becoming Supervisors was also a positive by-product that Babich is also very proud to report.<\/p>\n<p>In every aspect throughout the entire project, all Babich workers and staff maintained a very high professional attitude and commitment level. The professional atmosphere strengthened our relationship with the client and earned us the respect to assist moving forward to forge new business in the Middle East.<\/p>\n<p>I would like to personally thank the hundreds of Babich workers and staff who made the Jamal Abdul Nasser Bridge Project a success.<\/p>\n<p>Special mention goes to Mr. Serge Gendron for having confidence in Babich to be a part of such an important project and for Mr. Laurent Lafon whose memory will always be cherished within Babich.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2160.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<h2 style=\"margin-left:5pt\">Puente Jamal Nasser<\/h2>\n<p style=\"margin-left:5pt\">En el 2012, la sociedad ROBT (Rizanni De Eccher, Obrasc&oacute;n Huarte Lain, Boodai Construction, Joint Venture Group Trevi) le confi&oacute; a Babich International, una filial de Grupo AGF, el contrato para llevar a cabo las operaciones de instalaci&oacute;n de 120&nbsp;000&nbsp;t de acero de refuerzo para las estructuras del Puente Jamal Abdul Nasser.<\/p>\n<p style=\"margin-left:5pt\">Este emblem&aacute;tico proyecto del Estado de Kuwait comprende en total 7.2&nbsp;km de camino elevado sostenido por m&aacute;s de doscientos pilares. Dispone de aproximadamente 14&nbsp;km de rutas de servicio, de las cuales seis de enlace, nueve intersecciones giratorias, quince rampas de acceso, tres enlaces viales y un enlace vial de cuatro niveles.<\/p>\n<p style=\"margin-left:5.0pt\">Alex Schmalz, Director de Proyecto, Rizanni De Eccher, declar&oacute; recientemente: &ldquo;Fue un proyecto exigente, con requisitos de construcci&oacute;n de calidad elevada y exigencias de durabilidad a largo plazo. Aunque su realizaci&oacute;n sea compleja, la participaci&oacute;n de Babich nos permiti&oacute; alcanzar nuestros objetivos. Babich es un excelente proveedor de acero de refuerzo y un precioso miembro de nuestros proyectos en Medio Oriente.&rdquo;.<\/p>\n<p style=\"margin-left:5.0pt\">En los periodos de mayor afluencia, Babich emple&oacute; 270 personas e instal&oacute; 2800&nbsp;t de barras de refuerzo cada mes. Durante los largos meses de verano, el personal trabaj&oacute; a temperaturas extremas de m&aacute;s de 50<sup>o<\/sup> C y despu&eacute;s una baja r&aacute;pida de temperatura hasta -5<sup>o<\/sup>&nbsp;C a la llegada del invierno. El personal ven&iacute;a de varios pa&iacute;ses, entre ellos Canad&aacute;, India, Filipinas, Tailandia, Nepal y Francia.<\/p>\n<p style=\"margin-left:5.0pt\">El proyecto fue un &eacute;xito en todos los frentes. Babich respet&oacute; el presupuesto, sus objetivos y, en cinco a&ntilde;os, totaliz&oacute; m&aacute;s de 1.7 millones de horas de trabajo.<\/p>\n<p style=\"margin-left:5.0pt\">No hubo accidente notable. Varios contramaestres pudieron subir de nivel y volverse supervisores, lo cual es un orgullo para Babich.<\/p>\n<p style=\"margin-left:5.0pt\">En todos los aspectos del proyecto, todos los trabajadores y empleados de Babich conservaron una actitud muy profesional y un grado de entrega elevado. La atm&oacute;sfera profesional reforz&oacute; nuestra relaci&oacute;n con el cliente y nos ha tra&iacute;do la posibilidad de seguir adelante para formar nuevas ocasiones de negocios con el Medio Oriente.<\/p>\n<p style=\"margin-left:5.0pt\">Quiero agradecer personalmente a los cientos de trabajadores y empleados de Babich quienes hicieron que el proyecto del Puente Jamal Abdul Nasser fuera un &eacute;xito.<\/p>\n<p style=\"margin-left:5.0pt\">Una menci&oacute;n especial para el Sr.&nbsp;Serge Gendron por haber confiado en Babich para formar parte de un proyecto tan importante y al Sr.Laurent Lafont cuya memoria estar&aacute; siempre presente en Babich.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In 2012, Babich International was engaged by ROBT (Rizanni De Eccher, Obrasc&oacute;n Huarte Lain, Boodai [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":45407,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-45412","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/45412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=45412"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/45412\/revisions"}],"predecessor-version":[{"id":57850,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/45412\/revisions\/57850"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/45407"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=45412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=45412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=45412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}