{"id":46326,"date":"2019-11-15T14:26:00","date_gmt":"2019-11-15T19:26:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/espace-montmorency"},"modified":"2024-05-07T15:37:59","modified_gmt":"2024-05-07T19:37:59","slug":"espace-montmorency","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/espace-montmorency","title":{"rendered":"Espace Montmorency"},"content":{"rendered":"<div>\n<p>We&rsquo;re pleased to announce that we have signed a contract to provide more than 11, 000 MT of rebar for the construction of Espace Montmorency, located in Laval (north of Montreal).<br \/>\nThis is one of the largest mixed-use projects to be built in Laval. The brand new urban centre will be located in the heart of the city and will be directly linked to Montreal&rsquo;s underground network through the Montmorency metro station.&nbsp;<br \/>\nIt will consist of several dozen buildings&mdash;some up to 20 storeys high. There will be a wide variety of office space, caf&eacute;s and restaurants, as well as a hotel, numerous residential units and green spaces.&nbsp;<br \/>\n&#8220;With its bold &ldquo;design by block&rdquo; architecture, Espace Montmorency will be built continuously until the fall of 2022. To facilitate management of the project, it will be divided into three major stages <em><a href=\"https:\/\/espacemontmorency.com\/en\" target=\"_blank\" rel=\"noopener\">(source website espacemontmorency;com) <\/a><\/em>:<\/p>\n<p style=\"margin-left:40px\">&#8211; The first stage will involve laying the foundations for the project, building the underground parking for 1,400 vehicles and the two-storey retail podium;<\/p>\n<p style=\"margin-left:40px\">&#8211; The second stage will see the construction of towers 1 and 4, which will house 700 residential units;&nbsp;<\/p>\n<p style=\"margin-left:40px\">&#8211;&nbsp; The third stage includes tower 2, with 350,000 ft2 of office space, and tower 3, which will house a 180-room hotel.&#8221;<\/p>\n<p>AGF began working on this project in November and will continue until 2022. Depending on the period, there will be from 20 to 30 steelworkers assigned to the site.&nbsp;<br \/>\nWe wish great success to the entire team that will work on this project.&nbsp;<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2242.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<h2><strong>ESPACE MONTMORENCY<\/strong><\/h2>\n<p>Nos llena de orgullo anunciar la firma de un contrato de m&aacute;s de 11&nbsp;000&nbsp;t para el proyecto de construcci&oacute;n &ldquo;Espace Montmorency&rdquo;, situado en Laval (en el &aacute;rea norte de Montreal).<\/p>\n<p>Es uno de los proyectos inmobiliarios m&aacute;s importantes de uso mixto construido en Laval. Este nuevo centro urbano se ubicar&aacute; en el centro de la ciudad y estar&aacute; directamente vinculado con la red subterr&aacute;nea de Montreal, por medio de la estaci&oacute;n de metro Montmorency.<\/p>\n<p>Este centro urbano reagrupar&aacute; varias decenas de inmuebles, de los cuales varios ser&aacute;n hasta de veinte pisos. Habr&aacute; una gran oferta de oficinas, de caf&eacute;s, de restaurantes, un hotel y un gran n&uacute;mero de unidades residenciales y de espacios verdes.<\/p>\n<p>Dise&ntilde;ado con una arquitectura audaz, utilizando un &ldquo;dise&ntilde;o por bloques&rdquo;, el &ldquo;Espace Montmorency&rdquo; se realizar&aacute; de forma continua hasta el oto&ntilde;o de 2022. Para facilitar la gesti&oacute;n de la construcci&oacute;n, el proyecto ser&aacute; separado en tres grandes secciones <em><a href=\"https:\/\/espacemontmorency.com\/en\" target=\"_blank\" rel=\"noopener\">(source website espacemontmorency;com) <\/a><\/em>:<\/p>\n<p style=\"margin-left:40px\">&#8211; La primera secci&oacute;n corresponde a la edificaci&oacute;n de los cimientos del proyecto, a la construcci&oacute;n del estacionamiento subterr&aacute;neo de 1400&nbsp;plazas y de una base comercial de dos pisos<\/p>\n<p style=\"margin-left:40px\">&#8211; La segunda secci&oacute;n corresponde a la elevaci&oacute;n de las Torres 1 y 4, las cuales recibir&aacute;n los espacios residenciales, totalizando 700 unidades.<\/p>\n<p style=\"margin-left:40px\">&#8211;&nbsp; La tercera secci&oacute;n corresponde a la construcci&oacute;n de la Torre 2, la cual contar&aacute; con 3500&nbsp;000&nbsp;ft<sup>2<\/sup> de espacios de oficinas y de la Torre 3, la cual incluir&aacute; un hotel de 180 habitaciones.&#8221;<\/p>\n<p>Para AGF, los trabajos iniciaron este mes de noviembre y finalizar&aacute;n en el 2022. En total habr&aacute; de 20 a 30 trabajadores de acero en la obra.<\/p>\n<p>Le deseamos &eacute;xito a todo el equipo que colabora en el proyecto.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>We&rsquo;re pleased to announce that we have signed a contract to provide more than 11, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":46322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-46326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=46326"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46326\/revisions"}],"predecessor-version":[{"id":58486,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46326\/revisions\/58486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/46322"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=46326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=46326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=46326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}