{"id":46678,"date":"2020-03-10T11:51:00","date_gmt":"2020-03-10T15:51:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/caledonia-station"},"modified":"2024-05-07T15:39:21","modified_gmt":"2024-05-07T19:39:21","slug":"caledonia-station","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/caledonia-station","title":{"rendered":"Caledonia Station"},"content":{"rendered":"<div>\n<p>Our Kitchener division is currently working on the Caledonia station, which is under construction on Line 5&nbsp;Eglinton, Toronto&rsquo;s new LRT line.<\/p>\n<p>As a reminder, AGF Rebar has been mandated by the <a href=\"http:\/\/lereseau.groupeagf.com\/en\/articles\/Eglinton-Crosstown-LRT-Toronto\/\" target=\"_blank\" rel=\"noopener\">Crosslinx Transit Solution consortium <\/a>to supply, install and inspect reinforcing steel at several stations of the new light-rail transit project in Toronto.<\/p>\n<p>The team has done an outstanding job on the Caledonia station&rsquo;s roof slab (440 MT), which is notable for its 30-degree angle.<\/p>\n<p>These photos illustrate the complexity of the project :<\/p>\n<table align=\"center\" border=\"0\" cellpadding=\"1\" cellspacing=\"1\" style=\"width:500px\">\n<tbody>\n<tr>\n<td style=\"text-align:center\"><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0696-7.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<td><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0699-7.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<td><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0700-7.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This truly is a team effort, driven by the extensive technical expertise of Omayma&nbsp;Mohammad and Ketul Ruparelia, which is reflected in the shop drawings, as well as at the plant, which cut and bent the steel with precision. Not to mention the installation team, which spent two months fastening the steel in cold weather, Dilan Warnapura, who coordinated every detail, and Jaime Romeiro, who was the project leader.<\/p>\n<p>This achievement is an excellent demonstration of the quality of our work and embodies our company&rsquo;s values: teamwork, performance, expertise and determination.<\/p>\n<p>Kudos to the entire team for a job well done!<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2269.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<p><strong>Estaci&oacute;n Caledonia<\/strong><\/p>\n<p>Nuestra divisi&oacute;n de Kitchener realiza actualmente el proyecto de la estaci&oacute;n Caledonia, la cual est&aacute; en construcci&oacute;n en la nueva l&iacute;nea del metro de Toronto, la l&iacute;nea&nbsp;5, Eglinton.<\/p>\n<p>El equipo efectu&oacute; un trabajo excepcional de la losa del techo de la estaci&oacute;n Caledonia (440&nbsp;t) cuya particularidad es que tiene un &aacute;ngulo de inclinaci&oacute;n de 30&nbsp;grados.<\/p>\n<p>Las fotograf&iacute;as ilustran bien la complejidad de esta realizaci&oacute;n.<\/p>\n<table align=\"center\" border=\"0\" cellpadding=\"1\" cellspacing=\"1\" style=\"width:500px\">\n<tbody>\n<tr>\n<td style=\"text-align:center\"><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0696-8.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<td><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0699-8.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<td><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/IMG_0700-8.jpg\" style=\"height:300px; width:400px\" title=\"\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Es un verdadero proyecto de equipo, el cual reuni&oacute; los vastos conocimientos t&eacute;cnicos de Omayma&nbsp;Mohammad y de Ketul Ruparelia, los cuales se reflejan en los planos del taller, y tambi&eacute;n de la f&aacute;brica, en la que se cort&oacute; y pleg&oacute; el acero con precisi&oacute;n. No hay que olvidar al equipo de instalaci&oacute;n, el cual pas&oacute; dos meses uniendo el acero en el fr&iacute;o, a Dilan Warnapura, quien coordin&oacute; cada detalle, y a Jaime Romeiro, el l&iacute;der de este proyecto.<\/p>\n<p>Esta realizaci&oacute;n es una bella demostraci&oacute;n de la calidad de nuestro trabajo y personifica los valores de nuestra empresa: el trabajo de equipo, el desempe&ntilde;o, la competencia y la determinaci&oacute;n.<\/p>\n<p>&iexcl;Buen trabajo a todo el equipo!<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Our Kitchener division is currently working on the Caledonia station, which is under construction on [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":46661,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-46678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=46678"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46678\/revisions"}],"predecessor-version":[{"id":58754,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/46678\/revisions\/58754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/46661"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=46678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=46678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=46678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}