{"id":47280,"date":"2020-12-11T01:01:00","date_gmt":"2020-12-11T06:01:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/confederation-line"},"modified":"2024-05-07T15:41:40","modified_gmt":"2024-05-07T19:41:40","slug":"confederation-line","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/confederation-line","title":{"rendered":"Confederation Line"},"content":{"rendered":"<div>\n<p>It is with great pride that we announce that AGF STEEL has won the contract for phase 2 for the construction of the Ottawa light rail train (OLRT) &#8211; Confederation Line.<\/p>\n<p>This second phase concerns the extension of three tracks of the O&rsquo;TRAIN line allowing for the network to be enriched with 15 kilometers of railway line, 11 new stations and two new tunnels on Line 1.<\/p>\n<p>As a reminder, AGF Steel was involved in the first construction phase of the OLRT from 2014 to 2017 and at the time supplied nearly 12,000 mt of steel (see pictures below)<\/p>\n<p>AGF Ottawa will be supplying and installing the reinforcing steel for the cut and cover Tunnel for the Confederation Line West extension which essentially consists of three connecting tunnels, Parkway, Connaught and Pinecrest.<\/p>\n<p>This new contract represents more than 10,000 mt of steel which will be produced and installed by our teams from March 2021 until around July 2023.&nbsp;<\/p>\n<p>AGF will be working as the rebar subcontractor to KEV (Kiewit, Eurovia, Vinci Ottawa Partnership) and after a delayed start, we look forward to starting this next phase of light rail and realizing another successful project.&nbsp;<\/p>\n<p><u><strong>Pictures of the site during phase 1&nbsp;:<\/strong><\/u><\/p>\n<p><u><strong><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/OLRT-4.png\" style=\"height:400px; width:400px\" title=\"\">&#8203;<\/strong><\/u><\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2323.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<h3>Segunda fase del tren ligero de Ottawa<\/h3>\n<p>Es con gran orgullo que anunciamos que AGF Steel obtuvo el contrato para la segunda fase&nbsp;de la construcci&oacute;n del tren ligero de Ottawa, L&iacute;nea Confederaci&oacute;n.<\/p>\n<p>Esta segunda fase concierne la prolongaci&oacute;n de tres v&iacute;as de la l&iacute;nea O-Train, la cual permite aumentar 15&nbsp;km de l&iacute;nea f&eacute;rrea a la red, 11 nuevas estaciones y dos nuevos t&uacute;neles en la l&iacute;nea&nbsp;1.<\/p>\n<p>Cabe recordar que AGF&nbsp;Steel particip&oacute; en la primera etapa de la construcci&oacute;n del tren ligero, de 2014 a 2017, y que en aquel momento suministr&oacute; casi 12&nbsp;000&nbsp;t de acero.<\/p>\n<p>En el marco de este proyecto, AGF trabajar&aacute; como subcontratista de KEV (Kiewit, Eurovia, Vinci Ottawa Partnership) para el suministro y la instalaci&oacute;n de m&aacute;s de 10&nbsp;000&nbsp;t de acero de refuerzo de marzo de 2021 a aproximadamente julio de 2023.<\/p>\n<p>Despu&eacute;s de un inicio un poco tard&iacute;o, nos sentimos impacientes de iniciar esta nueva fase del tren ligero y de realizar con &eacute;xito un excelente proyecto.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>It is with great pride that we announce that AGF STEEL has won the contract [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":59173,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-47280","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=47280"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47280\/revisions"}],"predecessor-version":[{"id":59180,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47280\/revisions\/59180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/59173"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=47280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=47280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=47280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}