{"id":47528,"date":"2021-03-10T04:57:00","date_gmt":"2021-03-10T09:57:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/henri-iv-highway"},"modified":"2024-05-07T15:42:53","modified_gmt":"2024-05-07T19:42:53","slug":"henri-iv-highway","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/henri-iv-highway","title":{"rendered":"Henri IV Highway"},"content":{"rendered":"<div>\n<p><em>In&nbsp;collaboration with Claudine Faucher,&nbsp;Senior Director, Technical and Project Management Acier AGF Inc.<\/em><\/p>\n<p>Henri IV Highway is an urban highway serving the west and north ends of Quebec City. It is an important link in the city&#8217;s road network, transporting more than 100,000 vehicles each day.<\/p>\n<p>The widening and redevelopment of this highway, which began in 2018, is intended to improve its safety and efficiency.<\/p>\n<p>In addition to widening the highway to three lanes, the project required the construction of numerous structures such as gantry cranes, bridges, retaining walls, etc.<\/p>\n<h3>AGF&#8217;s Implication<\/h3>\n<p>Since work began, Acier AGF in Quebec City has been involved in several segments of the project:<br \/>\n&#8211; With EBC, for the widening of the Henri-IV highway at the intersections of Einstein Street and Wilfrid-Hamel Boulevard with a total of 6 bridges, a gantry and 3 retaining walls. This represents a total of 2, 000 MT of steel over 3 years.&nbsp;<\/p>\n<p>&#8211; With Hamel Construction, for a total of 1,025 MT over three years for the redevelopment of the Henri-IV and F&eacute;lix-Leclerc interchanges, with two overpasses and a gantry crane, as well as redevelopment of the Henri-IV and Charest interchanges.<\/p>\n<p>It was also the first project in Quebec City where we supplied stainless steel rebar for our work.<\/p>\n<p>Completion of AGF&rsquo;s work on this project is slated for fall 2021.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2349.jpg\" style=\"height:75px; width:450px\" title=\"\"><\/p>\n<h2>La autopista Henri IV<\/h2>\n<p>La autopista Henri IV es una autopista urbana en el oeste y norte de Quebec, la cual constituye una parte importante de la red vial de la ciudad, sobre la cual circulan m&aacute;s de 100&nbsp;000 veh&iacute;culos por d&iacute;a.<\/p>\n<p>La expansi&oacute;n y la restauraci&oacute;n de esta arteria, las cuales iniciaron en el 2018, tienen como misi&oacute;n mejorar su seguridad y su eficacia.<\/p>\n<p>Adem&aacute;s de la expansi&oacute;n a tres v&iacute;as de la autopista Henri IV, este proyecto requiri&oacute; la construcci&oacute;n de numerosas estructuras como p&oacute;rticos, puentes y muros de contenci&oacute;n.<\/p>\n<p>Desde el inicio de los trabajos, Acier AGF, en Quebec, ha participado en varias partes:<\/p>\n<ul>\n<li>Con EBC para un total de 1500&nbsp;t durante tres a&ntilde;os para la realizaci&oacute;n y la expansi&oacute;n;<\/li>\n<li>Con Hamel Construction para un total de 700&nbsp;t durante tres a&ntilde;os para el reajuste del intercambiador vial Henri-IV y F&eacute;lix-Leclerc con dos pasajes superiores y un p&oacute;rtico. Asimismo, para la restauraci&oacute;n del intercambiador vial Henri-IV y Charest.<\/li>\n<\/ul>\n<p>Adem&aacute;s, para los proyectos de Quebec, fue una primicia haber suministrado las barras de refuerzo de acero inoxidable para la realizaci&oacute;n de nuestros trabajos.<\/p>\n<p>Para AGF el t&eacute;rmino de la obra est&aacute; previsto durante el oto&ntilde;o de 2021.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In&nbsp;collaboration with Claudine Faucher,&nbsp;Senior Director, Technical and Project Management Acier AGF Inc. Henri IV Highway [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":47523,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-47528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=47528"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47528\/revisions"}],"predecessor-version":[{"id":59391,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47528\/revisions\/59391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/47523"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=47528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=47528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=47528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}