{"id":47650,"date":"2021-06-07T10:27:00","date_gmt":"2021-06-07T14:27:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/louis-hippolyte-lafontaine-tunnel-bridge"},"modified":"2024-05-07T15:43:13","modified_gmt":"2024-05-07T19:43:13","slug":"louis-hippolyte-lafontaine-tunnel-bridge","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/louis-hippolyte-lafontaine-tunnel-bridge","title":{"rendered":"Louis-Hippolyte Lafontaine Tunnel-Bridge"},"content":{"rendered":"<div>\n<p>AGF recently obtained the contract to rehabilitate the Louis-Hippolyte Lafontaine tunnel-bridge, located in Greater Montreal.<\/p>\n<p>This tunnel, which opened in 1967, is a critical segment of the Trans-Canada Highway. In addition to connecting several highways, it is a strategic road link for the metropolitan region, Quebec and Canada. With 120,000 vehicles per day, it is one of the busiest structures in Canada.<\/p>\n<p>Quebec&rsquo;s Transport Ministry wants to do major repairs to ensure the infrastructure&rsquo;s sustainability for the years ahead.<\/p>\n<p>Acier AGF will supply and install reinforcing steel starting June 15, until October 2023. The scope of our work is broad and includes the construction of arches, a new floor in the ventilation towers and airlocks in the corridors.<\/p>\n<p>For AGF, this landmark project represents more than 1,328 MT of 500W grade crenelated steel, with more than 630 MT of stainless steel, 686 MT of galvanized steel and 10 MT of black steel.<\/p>\n<p>In addition, AGF will carry out 10M, 15M and 20M chemical anchoring of different depths.<\/p>\n<p>Check back in a future <em>Network <\/em>for the latest developments from the site.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2363.jpg\" style=\"height:75px; width:450px\" title=\"\"><\/p>\n<h2>El puente-t&uacute;nel Louis-Hyppolyte Lafontaine<\/h2>\n<p>AGF obtuvo recientemente el contrato de rehabilitaci&oacute;n del puente-t&uacute;nel Louis-Hyppolyte Lafontaine, ubicado en el &aacute;rea metropolitana de Montreal. Inaugurado en 1967, este t&uacute;nel es un tramo importante de la autopista transcanadiense la cual, adem&aacute;s de unir varias autopistas entre ellas, es un enlace vial estrat&eacute;gico para la regi&oacute;n metropolitana, Quebec y Canad&aacute;. Con un flujo de 120&nbsp;000 veh&iacute;culos diarios, es una de las estructuras m&aacute;s frecuentadas de Canad&aacute;.<\/p>\n<p>El Ministerio de Transportes de Quebec desea realizar intervenciones importantes durante los pr&oacute;ximos a&ntilde;os. Acier AGF garantizar&aacute; el abastecimiento y la instalaci&oacute;n de acero de refuerzo desde el 15 de junio hasta octubre de 2023. La envergadura de los trabajos para AGF es grande, pero incluye espec&iacute;ficamente la construcci&oacute;n de arcos, de un piso nuevo en las torres de ventilaci&oacute;n e incluso de esclusas en los corredores.<\/p>\n<p>Este destacado proyecto representa para AGF m&aacute;s de 1328&nbsp;t de acero dentado grado 500W, del cual&nbsp;m&aacute;s de 630&nbsp;t de acero inoxidable, 686&nbsp;t de acero galvanizado y 10&nbsp;t de acero negro. Adem&aacute;s, AGF realizar&aacute; anclajes qu&iacute;micos de 10&nbsp;M, 15&nbsp;M y 20&nbsp;M de diferentes profundidades.<\/p>\n<p>En un pr&oacute;ximo n&uacute;mero de &ldquo;La Red&rdquo; podr&aacute; leer sobre la evoluci&oacute;n de la obra.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>AGF recently obtained the contract to rehabilitate the Louis-Hippolyte Lafontaine tunnel-bridge, located in Greater Montreal. [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":59469,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-47650","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=47650"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47650\/revisions"}],"predecessor-version":[{"id":59473,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47650\/revisions\/59473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/59469"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=47650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=47650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=47650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}