{"id":47848,"date":"2021-10-29T17:15:00","date_gmt":"2021-10-29T21:15:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/did-you-say-bim"},"modified":"2024-05-07T15:44:29","modified_gmt":"2024-05-07T19:44:29","slug":"did-you-say-bim","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/general-interest\/did-you-say-bim","title":{"rendered":"Did you say BIM?"},"content":{"rendered":"<div>\n<p>BIM&mdash;short for Building Information Modeling&mdash;is a structured method of working with a 3D digital model. It&rsquo;s a process for the development of a building, from its construction to its maintenance and use. It determines who does what, how and when.<\/p>\n<h3>BIM at AGF<\/h3>\n<p>AGF Quebec and AGF Tecnik recently successfully completed the initial integration of a rebar model with that of the professionals. The geo-referencing came off without a hitch, which means our elements are aligned with those already in the main model.<\/p>\n<p>Our goal is to work upstream, locating rebar congestion points as well as with other trades, viewing problem elements and carrying out prefabrication.<\/p>\n<p>AGF Tecnik produced all the 3D drawings of the selected elements identified as problematic on site. Their work was applauded by the project&rsquo;s professionals. Congratulations to the entire team!<\/p>\n<p>Following this great success, we&rsquo;re now in the integration phase of our second 3D project.<\/p>\n<p>The aim is to facilitate implementation, promote on-site collaboration and above all, to continue our efforts to become the best in the business!<\/p>\n<p><em>Document below is the one that was integrated into the main model. <\/em><\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/bim1-4.png\" style=\"height:430px; width:450px\" title=\"\"><\/p>\n<p><em>Document below is the project in progress.<\/em><\/p>\n<p><em><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/bim2-4.png\" style=\"height:329px; width:450px\" title=\"\"><\/em><\/p>\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>BIM&mdash;short for Building Information Modeling&mdash;is a structured method of working with a 3D digital model. [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":47841,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[217,233],"tags":[],"class_list":["post-47848","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-interest","category-innovation-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=47848"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47848\/revisions"}],"predecessor-version":[{"id":59682,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/47848\/revisions\/59682"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/47841"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=47848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=47848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=47848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}