{"id":48958,"date":"2023-06-14T09:40:00","date_gmt":"2023-06-14T13:40:00","guid":{"rendered":"https:\/\/groupeagf.com\/en\/the-network\/uncategorized\/projects-underway-in-sherbrooke"},"modified":"2024-05-07T15:48:40","modified_gmt":"2024-05-07T19:48:40","slug":"projects-underway-in-sherbrooke","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/projects-underway-in-sherbrooke","title":{"rendered":"Projects underway in Sherbrooke"},"content":{"rendered":"<div>\n<p><em>In collaboration with Jos&eacute; Rochette, P.Eng. and general manager, Armature Sherbrooke<\/em><\/p>\n<p>Over the past year, our Sherbrooke division has been involved in a number of large-scalem projects involving a variety of challenges. These projects called for a high level of teamwork,<br \/>\ncollaborating with our other divisions in Longueuil, Trois-Rivi&egrave;res and Tecnik (the division based in India).<\/p>\n<p><strong>The Chardonnay<\/strong><\/p>\n<p>The Chardonnay project, an eight-storey building that required 461 metric tons of steel, was executed entirely by Armature Sherbrooke from June 2022 to April 2023.<br \/>\nWith space on site limited, scheduling the steel deliveries was a big challenge. Fortunately, we rose to the challenge with flying colours, efficiently planning deliveries throughout the project.<br \/>\nSocial housing on Galt Street East in Sherbrooke Construction of this six-storey building comprising 116 social housing units began in August 2022 and is slated for completion in August 2023. The project called for 280 metric tons of steel.<br \/>\nWith three separate units involved, each with its own way of doing things, coordination was key.<br \/>\nAGF Longueuil and AGF Tecnik collaborated on detailing, AGF Trois-Rivi&egrave;res handled fabrication, while Armature Sherbrooke was responsible for installation. This close cooperation among our units underscores the importance of teamwork on complex projects such as this.<\/p>\n<p><strong>Coaticook Seniors Centre<\/strong><\/p>\n<p>Work on this four-storey building, requiring 450 metric tons of steel, began in June 2022 and is scheduled to be completed in summer 2023. Armature Sherbrooke received timely fabrication<br \/>\nassistance from AGF Trois-Rivi&egrave;res in executing the project.<\/p>\n<p><strong>Reconstruction of the East Angus bridge<\/strong><\/p>\n<p>This 125-metre-long bridge, which called for 150 metric tons of steel, was rebuilt between September 2022 and May 2023.<\/p>\n<p>The project was especially challenging because of its tight schedule, with the first phase taking place in fall 2022, followed by a second in spring 2023. In November and December 2022, a<br \/>\nteam of installers from AGF Trois-Rivi&egrave;res came to lend a hand to our team in Sherbrooke.<br \/>\nThanks to their collaboration, we were able to meet our customer&amp;#39;s deadline!<\/p>\n<p>In short, pooling our strengths ensured the success of these complex projects. Close collaboration and teamwork played a key role in bringing them to fruition. It&#8217;s an approach that<br \/>\nhas big benefits for our customers!<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2024\/05\/Ligne_bleue_separation_version_e-2488.jpg\" style=\"height:67px; width:400px\" title=\"\"><\/p>\n<h3><strong>Los proyectos en curso en Sherbrooke<\/strong><\/h3>\n<p>Los proyectos se realizan en colaboraci&oacute;n con Jos&eacute; Rochette, ing., Director General de Armature Sherbrooke.<\/p>\n<p>Durante el &uacute;ltimo a&ntilde;o, nuestra divisi&oacute;n de Sherbrooke ha participado en varios proyectos de gran envergadura que han presentado diversos desaf&iacute;os. Estos proyectos han requerido un s&oacute;lido esp&iacute;ritu de equipo debido a la colaboraci&oacute;n con nuestras otras divisiones de Longueuil, Trois-Rivi&egrave;res y Tecnik (divisi&oacute;n basada en India).<\/p>\n<p><strong>Le Chardonnay<\/strong><\/p>\n<p>El proyecto de Chardonnay, un inmueble de 8&nbsp;pisos que requiri&oacute; 461&nbsp;t de acero, fue realizado completamente por Armature Sherbrooke de junio de 2022 a abril de 2023. Debido a un restringido espacio en la obra, la planificaci&oacute;n de entregas de acero representaba un importante desaf&iacute;o. Afortunadamente, superamos el desaf&iacute;o con br&iacute;o y las entregas fueron planeadas de manera eficaz durante todo el proyecto.<br \/>\n&nbsp;<\/p>\n<p><strong>Viviendas de inter&eacute;s social en la calle Galt Est en Sherbrooke<\/strong><\/p>\n<p>La construcci&oacute;n de este edificio de 6&nbsp;pisos que incluye 116&nbsp;viviendas de inter&eacute;s social inici&oacute; en agosto de 2022 y su finalizaci&oacute;n est&aacute; prevista para agosto de 2023. Este proyecto requiere 280&nbsp;t de acero.<\/p>\n<p>La coordinaci&oacute;n ha sido esencial debido a la participaci&oacute;n de tres unidades distintas, cada una con su propia manera de trabajar. AGF Longueuil y AGF Tecnik colaboraron durante el detallado; AGF Trois-Rivi&egrave;res se encarg&oacute; de la fabricaci&oacute;n, y Armature Sherbrooke se asegur&oacute; de la instalaci&oacute;n. Esta estrecha colaboraci&oacute;n entre nuestras unidades puso en evidencia la importancia del esp&iacute;ritu de equipo durante la realizaci&oacute;n de proyectos complejos como este.<br \/>\n&nbsp;<\/p>\n<p><strong>Casa para ancianos de Coaticook<\/strong><\/p>\n<p>Este edificio de 4&nbsp;pisos, que requiere 450&nbsp;t de acero, inici&oacute; en junio de 2022 y su finalizaci&oacute;n est&aacute; prevista para el verano de 2023. Realizado por Armature Sherbrooke, este proyecto ha recibido el apoyo especial de AGF Trois-Rivi&egrave;res para la fabricaci&oacute;n.<br \/>\n&nbsp;<\/p>\n<p><strong>Reconstrucci&oacute;n del puente East Angus<\/strong><\/p>\n<p>La reconstrucci&oacute;n de este puente de 125&nbsp;m de largo fue realizada de septiembre de 2022 a mayo de 2023 y requiri&oacute; 150&nbsp;t de acero.<\/p>\n<p>Este proyecto represent&oacute; un desaf&iacute;o particular debido a los exigentes plazos, con una primera fase en el oto&ntilde;o de 2022 y una segunda en la primavera de 2023. En noviembre y diciembre de 2022, un equipo de instaladores de AGF Trois-Rivi&egrave;res fue a ayudar a nuestro equipo de Sherbrooke. Gracias a esta colaboraci&oacute;n, &iexcl;pudimos respetar los plazos de nuestros clientes satisfactoriamente!<\/p>\n<p>En resumen, al unir nuestras fuerzas, estos proyectos han alcanzado el &eacute;xito. La estrecha colaboraci&oacute;n y el esp&iacute;ritu de equipo jugaron un papel importante en la realizaci&oacute;n de estos complejos proyectos. &iexcl;Es gracias a este enfoque que nuestros clientes pueden beneficiarse plenamente!<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In collaboration with Jos&eacute; Rochette, P.Eng. and general manager, Armature Sherbrooke Over the past year, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":48953,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-48958","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/48958","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=48958"}],"version-history":[{"count":2,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/48958\/revisions"}],"predecessor-version":[{"id":60445,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/48958\/revisions\/60445"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/48953"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=48958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=48958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=48958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}