{"id":68922,"date":"2026-09-25T17:07:25","date_gmt":"2026-09-25T21:07:25","guid":{"rendered":"https:\/\/groupeagf.com\/?p=68922"},"modified":"2026-10-09T11:59:04","modified_gmt":"2026-10-09T15:59:04","slug":"a-record-breaking-caisson-for-agf","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/en\/the-network\/projects\/a-record-breaking-caisson-for-agf","title":{"rendered":"A Record-Breaking Caisson for AGF"},"content":{"rendered":"<p>AGF is currently contributing to the construction of the new \u00cele-d\u2019Orl\u00e9ans bridge project of the minist\u00e8re des Transports et de la Mobilit\u00e9 durable, a major infrastructure project that will support mobility between \u00cele d\u2019Orl\u00e9ans and the Quebec City region for decades to come. The current bridge plays an essential role in daily travel in the region, with nearly 12,000 vehicles crossing it every day.<\/p>\n<h2><span style=\"color: #165788;\">A record-breaking achievement for AGF<\/span><\/h2>\n<p>As part of this project, AGF is supplying the reinforcing steel and prefabricating several foundation structures. Among them is a record-breaking achievement: <strong><span style=\"color: #165788;\">the longest rebar caisson ever fabricated in AGF\u2019s history<\/span><\/strong>.<\/p>\n<h3><span style=\"color: #d77e25;\">\ud83d\udca1 What is a caisson?<\/span><\/h3>\n<p>A caisson is a reinforcing steel structure used to reinforce the foundations of a structure. As part of the new \u00cele-d\u2019Orl\u00e9ans bridge project, the caissons are installed inside drilled shafts before concrete is poured, helping ensure the stability and durability of the future bridge piers (pillars).<\/p>\n<p>&nbsp;<\/p>\n<p>To make its fabrication, transportation and installation possible, this massive caisson was divided into six prefabricated sections. Once on the job site, the sections were assembled and connected one by one to form a final structure more than 100 metres high. Once assembled, the caisson was installed at the bottom of the St. Lawrence River, inside a drilled shaft.<\/p>\n<h2><span style=\"color: #165788;\">Prefabrication at the heart of the project<\/span><\/h2>\n<p>Building a structure of this scale begins long before it reaches the job site. It all starts at AGF\u2019s shop, where each of the caisson\u2019s six sections is prefabricated by our teams.<\/p>\n<p>Thanks to its facilities, equipment and the expertise of its teams, AGF is able to complete a significant portion of the work at its prefabrication shop before the sections reach the job site. This approach allows work to be carried out in an environment with reduced health and safety risks, ensures better quality control and helps optimize operations on site.<\/p>\n<p>Once prefabricated, each section is transported separately by trailer to the job site.<\/p>\n<h2><span style=\"color: #165788;\">Major logistical challenges<\/span><\/h2>\n<p>Transporting the caisson sections to the job site presented a major challenge due to their size and weight. Some sections measured up to 27 metres long and weighed nearly 44 tonnes. Moving them required specialized transportation, along with careful planning to coordinate deliveries with the construction schedule.<\/p>\n<h2><span style=\"color: #165788;\">A key partnership for the project\u2019s success<\/span><\/h2>\n<p>A project of this scale also relies on close collaboration between several partners. We would like to recognize the work of our partner, Armatures EB, whose teams played a key role in assembling and installing the caisson sections on the job site. Their expertise greatly contributes to the successful execution of the work.<\/p>\n<h2><span style=\"color: #165788;\">A custom-engineered solution<\/span><\/h2>\n<p>Lifting and installing the caisson sections also presented a major challenge due to their exceptional size. To meet the project\u2019s specific requirements, AGF worked closely with an engineering firm to develop a lifting solution tailored to this unique structure. This approach helped ensure the safe handling and installation of each section on the job site.<\/p>\n<p>This achievement is a great example of AGF\u2019s ability to adapt to the unique requirements of each project and develop solutions that meet the specific needs of its clients.<\/p>\n<p>&#8211;<\/p>\n<figure id=\"attachment_68925\" aria-describedby=\"caption-attachment-68925\" style=\"width: 450px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-68925 \" src=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2026\/09\/Creation-sans-titre-4-1.jpg\" alt=\"\" width=\"450\" height=\"253\" title=\"\" srcset=\"https:\/\/groupeagf.com\/wp-content\/uploads\/2026\/09\/Creation-sans-titre-4-1.jpg 1920w, https:\/\/groupeagf.com\/wp-content\/uploads\/2026\/09\/Creation-sans-titre-4-1-1536x864.jpg 1536w, https:\/\/groupeagf.com\/wp-content\/uploads\/2026\/09\/Creation-sans-titre-4-1-500x281.jpg 500w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><figcaption id=\"caption-attachment-68925\" class=\"wp-caption-text\">A section of the rebar caisson delivered to the new \u00cele-d\u2019Orl\u00e9ans bridge construction site.<\/figcaption><\/figure>\n<h2><span style=\"color: #165788;\">A milestone achievement for AGF<\/span><\/h2>\n<p>Congratulations and thank you to everyone who contributed to this achievement!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AGF is currently contributing to the construction of the new \u00cele-d\u2019Orl\u00e9ans bridge project of the [&hellip;]<\/p>\n","protected":false},"author":24,"featured_media":68921,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[221],"tags":[],"class_list":["post-68922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/68922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/comments?post=68922"}],"version-history":[{"count":3,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/68922\/revisions"}],"predecessor-version":[{"id":69089,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/posts\/68922\/revisions\/69089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media\/68921"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/media?parent=68922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/categories?post=68922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/en\/wp-json\/wp\/v2\/tags?post=68922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}