{"id":41867,"date":"2012-01-23T00:00:00","date_gmt":"2012-01-23T05:00:00","guid":{"rendered":"https:\/\/groupeagf.com\/fr\/le-reseau\/non-classifiee\/acier-agf-longueuil-obtient-un-nouveau-contrat"},"modified":"2024-05-07T15:19:41","modified_gmt":"2024-05-07T19:19:41","slug":"acier-agf-longueuil-obtient-un-nouveau-contrat","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/fr\/le-reseau\/projets\/acier-agf-longueuil-obtient-un-nouveau-contrat","title":{"rendered":"Acier AGF Longueuil obtient un nouveau contrat"},"content":{"rendered":"<div>\n<p>Au nom d\u2019Acier AGF Longueuil, je suis fier d\u2019annoncer l\u2019obtention d\u2019un r\u00e9cent contrat : la construction du bloc D du nouveau Centre hospitalier de l\u2019Universit\u00e9 de Montr\u00e9al (CHUM).<\/p>\n<p>\nLe bloc D repr\u00e9sente une quantit\u00e9 approximative de 8 000 tonnes d\u2019acier et prendra la forme d\u2019une tour de 20 \u00e9tages.<\/p>\n<p>\nSa construction devrait d\u00e9buter en avril 2012 et se terminer en octobre 2013.<\/p>\n<p>\nLe bloc D s\u2019ajoute au contrat du bloc B-1, \u00e0 la construction des parois moul\u00e9es en b\u00e9ton arm\u00e9 de m\u00eame qu\u2019\u00e0 plusieurs autres travaux pr\u00e9paratoires du nouveau CHUM.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00c0 propos du CHUM<\/strong><\/p>\n<p>Le Centre hospitalier de l\u2019Universit\u00e9 de Montr\u00e9al est le plus grand centre hospitalier universitaire francophone en Am\u00e9rique du Nord. Il accueille chaque ann\u00e9e plus d\u2019un demi-million de patients provenant de la grande r\u00e9gion montr\u00e9alaise, mais aussi d\u2019ailleurs au Qu\u00e9bec. Riche de son histoire, le CHUM est r\u00e9solument tourn\u00e9 vers l\u2019avenir, avec la construction en cours de ses futures installations et de son centre de recherche au centre-ville de Montr\u00e9al, un projet global de pr\u00e8s de 2,5 milliards de dollars sur un site unique. D\u00e8s 2013, le Centre de recherche du CHUM ouvrira ses portes. Il sera suivi en 2016 par l\u2019ouverture du nouveau CHUM, un centre hospitalier universitaire de calibre international enti\u00e8rement fonctionnel de 772 lits dont l\u2019ach\u00e8vement est pr\u00e9vu pour 2019. (Source : http:\/\/www.nouveauchum.com\/)<br \/>\n&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Au nom d\u2019Acier AGF Longueuil, je suis fier d\u2019annoncer l\u2019obtention d\u2019un r\u00e9cent contrat : la [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":41865,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[220],"tags":[],"class_list":["post-41867","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/41867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/comments?post=41867"}],"version-history":[{"count":1,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/41867\/revisions"}],"predecessor-version":[{"id":49612,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/41867\/revisions\/49612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media\/41865"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media?parent=41867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/categories?post=41867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/tags?post=41867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}