{"id":44701,"date":"2018-02-16T15:54:00","date_gmt":"2018-02-16T20:54:00","guid":{"rendered":"https:\/\/groupeagf.com\/fr\/le-reseau\/non-classifiee\/nouveau-contrat-plateforme-de-west-white-rose"},"modified":"2024-05-07T15:30:26","modified_gmt":"2024-05-07T19:30:26","slug":"nouveau-contrat-plateforme-de-west-white-rose","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/fr\/le-reseau\/projets\/nouveau-contrat-plateforme-de-west-white-rose","title":{"rendered":"Nouveau contrat : plateforme de West White Rose"},"content":{"rendered":"<div>\n<p>Le Groupe AGF est fier d\u2019annoncer l\u2019obtention d\u2019un contrat portant sur la construction de la plateforme p\u00e9troli\u00e8re West White Rose \u00e0 Terre-Neuve-et-Labrador.&nbsp;<\/p>\n<p>Plus pr\u00e9cis\u00e9ment, AGF participera \u00e0 la r\u00e9alisation de la structure gravitaire en b\u00e9ton (SGB) et sera en charge de la coupe, du pliage et de la livraison d\u2019environ 16 000 TM d\u2019acier d\u2019armature.&nbsp;<\/p>\n<p>Le contrat d\u00e9butera en mars 2018 et s\u2019\u00e9chelonnera sur une p\u00e9riode de 24 mois. AGF montera une usine d\u00e9di\u00e9e \u00e0 St John pour r\u00e9aliser le projet.<\/p>\n<p>Fort de son exp\u00e9rience acquise sur les chantiers p\u00e9troliers d\u2019Hibernia (1996) et H\u00e9bron (2016), le Groupe AGF est heureux de pouvoir d\u00e9montrer \u00e0 nouveau son expertise sur ce projet de grande envergure.<\/p>\n<h3>Donn\u00e9es techniques<\/h3>\n<p>La plateforme sera construite en cale s\u00e8che \u00e0 Argentia.&nbsp;<br \/>\nLa structure gravitaire en b\u00e9ton aura un diam\u00e8tre de 122 m\u00e8tres, sera compos\u00e9e de 76 000 m3 de b\u00e9ton et p\u00e8sera 210 000 tonnes. Elle sera surmont\u00e9e d\u2019un module d\u2019installations en surface qui permettra le forage et l\u2019extraction du p\u00e9trole.<\/p>\n<p>Une fois construite, la SGB sera remorqu\u00e9e jusqu&rsquo;au champ p\u00e9trolier de White Rose, \u00e0 environ 350 kilom\u00e8tres \u00e0 l&rsquo;est de St. John&rsquo;s.&nbsp;<\/p>\n<p>Source: <a href=\"http:\/\/westwhiteroseproject.ca\" target=\"_blank\" rel=\"noopener\">Site Web de West White Rose Project<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Le Groupe AGF est fier d\u2019annoncer l\u2019obtention d\u2019un contrat portant sur la construction de la [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":44699,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[220],"tags":[],"class_list":["post-44701","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/44701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/comments?post=44701"}],"version-history":[{"count":1,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/44701\/revisions"}],"predecessor-version":[{"id":51730,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/44701\/revisions\/51730"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media\/44699"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media?parent=44701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/categories?post=44701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/tags?post=44701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}