{"id":47647,"date":"2021-06-07T10:27:00","date_gmt":"2021-06-07T14:27:00","guid":{"rendered":"https:\/\/groupeagf.com\/fr\/le-reseau\/non-classifiee\/pont-tunnel-lafontaine"},"modified":"2024-05-07T15:43:13","modified_gmt":"2024-05-07T19:43:13","slug":"pont-tunnel-lafontaine","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/fr\/le-reseau\/projets\/pont-tunnel-lafontaine","title":{"rendered":"Pont-Tunnel Lafontaine"},"content":{"rendered":"<div>\n<p>AGF a r\u00e9cemment remport\u00e9 le contrat de r\u00e9habilitation du Pont-tunnel&nbsp;Louis-Hippolyte Lafontaine situ\u00e9 dans l\u2019agglom\u00e9ration de Montr\u00e9al.&nbsp;<\/p>\n<p>Inaugur\u00e9 en 1967, ce tunnel est un important tron\u00e7on de l\u2019autoroute Transcanadienne qui, en plus de relier plusieurs autoroutes entre elles, constitue un lien routier strat\u00e9gique pour la r\u00e9gion m\u00e9tropolitaine, le Qu\u00e9bec et le Canada. Avec son d\u00e9bit de 120 000 v\u00e9hicules par jour, il est l\u2019une des structures les plus achaland\u00e9es au Canada.&nbsp;<br \/>\nLe Minist\u00e8re des Transports du Qu\u00e9bec souhaite effectuer des interventions majeures pour assurer la p\u00e9rennit\u00e9 de l\u2019infrastructure durant les prochaines ann\u00e9es.<\/p>\n<p>Acier AGF assurera la fourniture et la pose d\u2019acier d\u2019armature d\u00e8s le 15 juin jusqu\u2019en octobre 2023. L\u2019\u00e9tendue des travaux pour AGF est large mais elle inclut notamment la construction des arches, d\u2019un nouveau plancher dans les tours de ventilation ou encore de sas dans les corridors.<\/p>\n<p>Ce projet marquant repr\u00e9sente pour AGF plus de 1328 tm d\u2019acier cr\u00e9nel\u00e9 de grade 500W dont plus de 630 tm d\u2019acier inoxydable, 686 tm d\u2019acier galvanis\u00e9 et 10 tm d\u2019acier noir.&nbsp;<\/p>\n<p>De plus, AGF r\u00e9alisera des ancrages chimiques de 10M, 15M et 20M de diff\u00e9rentes profondeurs.<\/p>\n<p>Rendez-vous dans un prochain<em> R\u00e9seau<\/em> pour suivre l\u2019\u00e9volution de chantier.&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>AGF a r\u00e9cemment remport\u00e9 le contrat de r\u00e9habilitation du Pont-tunnel&nbsp;Louis-Hippolyte Lafontaine situ\u00e9 dans l\u2019agglom\u00e9ration de [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":59469,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[220],"tags":[],"class_list":["post-47647","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/47647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/comments?post=47647"}],"version-history":[{"count":1,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/47647\/revisions"}],"predecessor-version":[{"id":54064,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/47647\/revisions\/54064"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media\/59469"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media?parent=47647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/categories?post=47647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/tags?post=47647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}