{"id":60878,"date":"2024-05-07T15:18:39","date_gmt":"2024-05-07T19:18:39","guid":{"rendered":"https:\/\/groupeagf.com\/fr\/le-reseau\/"},"modified":"2024-05-17T15:24:34","modified_gmt":"2024-05-17T19:24:34","slug":"block15-toronto","status":"publish","type":"post","link":"https:\/\/groupeagf.com\/fr\/le-reseau\/projets\/block15-toronto","title":{"rendered":"Block 15 \u00e0 Toronto"},"content":{"rendered":"<p><em>Article \u00e9crit en collaboration avec Ehab Mahdaly, Directeur risques et contrats.<\/em><\/p>\n<p>AGF joue un r\u00f4le cl\u00e9 dans le projet Block 15, situ\u00e9 dans le quartier de North York, \u00e0 Toronto. Ce projet, con\u00e7u par Dialog Architects, se distingue par trois tours r\u00e9sidentielles majestueuses de 19, 27 et 31 \u00e9tages, totalisant 990 unit\u00e9s d&rsquo;habitation.<\/p>\n<p>Il n\u00e9cessite un tonnage de 7 000 tonnes m\u00e9triques d&rsquo;acier, dont 300 tonnes d\u2019acier de grade 500 W, et 1 500 <em>studrails<\/em>.<\/p>\n<p>Depuis le d\u00e9but de notre implication dans le projet, nous avons d\u00e9j\u00e0 achemin\u00e9 5 600 tonnes. Le client, Concord Adex pr\u00e9voit de finaliser les travaux concernant l&rsquo;armature et le b\u00e9ton avant la fin de l\u2019ann\u00e9e 2024.<\/p>\n<p>La cadence soutenue des travaux est rendue possible gr\u00e2ce \u00e0 l&rsquo;utilisation de syst\u00e8mes de coffrage volants, ou \u00ab fly forms \u00bb. Ces syst\u00e8mes automatis\u00e9s permettent de couler rapidement et efficacement le b\u00e9ton pour chaque \u00e9tage d&rsquo;une structure, r\u00e9duisant ainsi le temps de construction d&rsquo;un \u00e9tage \u00e0 seulement une semaine.<\/p>\n<p>Ce projet comporte de nombreux \u00e9l\u00e9ments interd\u00e9pendants. Par cons\u00e9quent, un de nos d\u00e9fis est de maintenir une bonne coordination des \u00e9quipes. Dans un projet d\u2019une telle complexit\u00e9, l\u2019apport de chacun et la mani\u00e8re dont toute l&rsquo;\u00e9quipe collabore ensemble en tant qu&rsquo;unit\u00e9 sont essentiels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Article \u00e9crit en collaboration avec Ehab Mahdaly, Directeur risques et contrats. AGF joue un r\u00f4le [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":60879,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[220],"tags":[],"class_list":["post-60878","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets"],"acf":[],"_links":{"self":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/60878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/comments?post=60878"}],"version-history":[{"count":4,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/60878\/revisions"}],"predecessor-version":[{"id":60885,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/posts\/60878\/revisions\/60885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media\/60879"}],"wp:attachment":[{"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/media?parent=60878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/categories?post=60878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groupeagf.com\/fr\/wp-json\/wp\/v2\/tags?post=60878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}