Tonnage: 76 000 MT
Year: 2019-2022
Contractor: Consortium Metro Lima 2
AGF Peru is involved in the fabrication and installation of 100% of the rail segments and 25% of the stations of the Lima Metro.
In December 2019, the team began work on the first slab supported on the exterior walls of Station 4. Installation of the walls for Station 3 began in March 2020, and for Station 2 in October.