Tonnage: 75, 000 MT
Year: 2005-2009
General Contractor: VSL-Freyssinet-Rizzani
Dubai’s metro is the world’s largest fully automated rail-based metro system, with a route length of 75 km.
Up to 220 employees (peak period) manufactured a total of 75,000 tons of reinforcing bars for this construction, which was carried out in two phases.
Please complete the following form
Please complete the following form