Tonnage : 5,200 MT
Year : 2023-2025
AGF International (EMCA) is involved in a major project in Europe: the Grand Paris Express.
In more detail, between 6 and 15 workers from AGF International (EMCA) are involved for 2 years in the construction of line 15 South (up to 1,000 MT), line 18.1 (3,000 MT) and line 17.2 (1,200 MT). This project of 5,200 metric tons of reinforcing steel should be completed in June 2025.
The project includes the construction of 3 viaducts. A 3km long viaduct as well as two road crossing structures above the A1/A3 motorways (200 meters long) and the RD40 South (145 meters long, curved, with very precise phasing requirements due to interventions during night-time traffic interruptions).