Tonnage: 350 TM
Year: 2020-2021
Contractor: Ministère des Transports et Infrastructure du Nouveau Brunswick
This 216-metre bridge is located on Highway 11, in the Shediac region (Westmorland County). The contract involves supplying and installing 350 tonnes of steel, including 90 tonnes of stainless steel.
The project began in February 2020 with prefabrication of columns and caissons (with an average length of 18 meters and 15 meters) at our Caraquet plant, and installation got under way in May 2020.
The project should be completed by the end of summer 2021.