Early April 2023, our team in Trois-Rivières has begun its work on the footing of the Laviolette Bridge in Trois-Rivières. This bridge links the cities of Trois-Rivières and Bécancour.
In order to preserve its condition, its central slab is being replaced and the work should extend between 2023 and 2025 to limit and extend the impact on road traffic.
AGF’s work consists of replacing the reinforcing steel at this location in order to restore this part of the bridge.
This represents 5.4 metric tons of reinforcing steel.
Success to the team on site.
Desde principios del mes de abril, nuestro equipo de Trois-Rivières inició el trabajo de reparación de las zapatas del Puente Laviolette en Trois-Rivières, el cual conecta las ciudades de Trois-Rivières y de Bécancour.
Para preservar su estado, la losa central está siendo reemplazada y los trabajos deberán prolongarse entre el 2023 y el 2025 para limitar el impacto de los trabajos en la circulación vial.
El trabajo de AGF consiste en reemplazar el acero de refuerzo presente para restaurar esta parte del puente. Esto representa 5.4 t de acero de refuerzo.
Buen trabajo a todo el equipo en el lugar.